218 Renovations logo
All work

Edens Landing · Bathrooms

A step-free shower for owners staying put

The step over the shower hob removed by re-running the drainage, then retiled in travertine.

A master ensuite that had no door

What wasn't working

The tiling was dated, and the shower had a high hob to step over. For owners who intended to stay in the house, getting in and out was becoming harder than it should be.

What we did

We re-ran the drainage so the shower floor could be brought level with the rest of the room, which removed the step altogether. The room was retiled in travertine — the finish we are asked for most at the moment — and finished with white cabinetry and nickel tapware for a clean, modern look.

What was included

  • New drainage for a level shower floor
  • Travertine floor and wall tiling
  • White cabinetry
  • Nickel tapware

Tell us what isn't working.

Send through a couple of photos of the room, or call and describe it. We will tell you honestly whether it is a repair or a renovation.

0415 859 297
Mon – Fri, 7:00am – 5:00pm